Quality Lenox GA septic system installers do a lot of examination, long before a unit gets put into the ground. A brand new unit will last years, and possibly even generations, if it’s installed the right way, but it can fall short instantly if it’s not. Furthermore, all Lenox GA septic system installers must secure a permit for them to carry out the install, and may ought to collaborate with city or county officials to show that specific tests were performed in order to continue. These three tests are vital initial steps that should always be taken before any job or designs are done, and it may also be helpful to do them before you acquire a property, so you can be assured that a tank and leach field will be allowed.

1. Pit

The pit test is very straightforward. In the course of this test, a hole is dug down and the soil is examined to figure out its structure. A typical leach field is reliant on the soil’s composition to drain successfully. If there is a bunch of gravel or sand, your leach field should be capable to discharge the effluent (water) from the tank well, where the soil will finish cleaning it. If the soil has a bunch of clay or rock, it won’t drain well, therefore a conventional leach field will not be an alternative. If the location you’ve picked does not pass the pit test, you may be able to pick another site on your home or use an alternate kind of drain field, such as a mound system.

2. Perc

The perc, or percolation test, consists of digging a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then saturating it with water. The hole is typically left drenched for about two hours, and refilled as needed. After this, the hole is filled with 6 inches of water and observed for drainage.

3. Visual

There are many things an inspector will check into visually. Most units are gravity-fed, so they don’t depend on electricity or pumps to move effluent from the tank to the leach field. Because of this, the slope of the ground is crucial. An inspector will also seek out slopes that could feed excess water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.

Enlist the Services of Quality Lenox GA Septic System Installers Now

Picking the right configuration, kind of system, and evaluating the land correctly, are all integral procedures in making sure an install goes off without a hitch. Most significantly, these steps ensure that the install is done correctly, so that a system provides many years of use without problems. If you’re prepping for an install, call Septic Tank Pros Valdosta GA. Our partner specialists are skilled and devoted to quality, so you could be sure the job is done right. Call (229) 415-7780 right now.

The post 3 Evaluations Quality Lenox GA Septic System Installers Perform Before Designing appeared first on Septic Tank Pros Valdosta GA.



from Septic Tank Pros Valdosta GA http://septictankvaldostaga.com/lenox-ga-septic-system-installers/
via IFTTT

No comments:

Post a Comment