Quality Valdosta GA septic system installers do a great deal of examination, long before a unit gets put into the ground. A brand new unit will last years, and possibly even generations, if it’s installed correctly, but it can break down instantaneously if it’s not. Furthermore, all Valdosta GA septic system installers must obtain a permit for them to perform the install, and may ought to collaborate with city or county officials to show that certain tests were done in order to continue. These three tests are necessary first steps that should always be taken before any job or designs are done, and it may also be beneficial to accomplish them before you purchase a property, so you could be assured that a tank and leach field will be permitted.

1. Pit

The pit test is very direct. During this test, a hole is dug and the soil is examined to establish its structure. A typical leach field is reliant on the soil’s structure to drain successfully. If there is a considerable amount of gravel or sand, your leach field should be able to discharge the effluent (water) from the tank well, where the soil will finish sanitizing it. If the soil has a lot of clay or rock, it won’t drain well, consequently a standard leach field will not be an option. If the site you’ve selected does not pass the pit test, you may be able to choose another site on your house or use an alternate type of drain field, like a mound system.

2. Perc

The perc, or percolation test, consists of digging a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then filling it with water. The hole is typically left saturated for about two hours, and topped off as needed. After this, the hole is filled with 6 inches of water and monitored for drainage.

3. Visual

There are several things an inspector will check into visually. Most units are gravity-fed, so they don’t rely upon electricity or pumps to transfer effluent from the tank to the leach field. Because of this, the incline of the ground is essential. An inspector will also look for slopes that can feed excess water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.

Work with Quality Valdosta GA Septic System Installers Today

Selecting the right design, kind of system, and assessing the land properly, are all essential procedures in making sure an install goes off without a hitch. Most significantly, these steps guarantee that the install is done correctly, so that a system provides decades of use without issue. If you’re preparing for an install, contact Septic Tank Pros Valdosta GA. Our partner technicians are skilled and devoted to quality, so you can be sure the job is done right. Call (229) 415-7780 right now.

The post 3 Evaluations Quality Valdosta GA Septic System Installers Perform Before Designing appeared first on Septic Tank Pros Valdosta GA.



from Septic Tank Pros Valdosta GA http://ift.tt/2yvnBPJ
via IFTTT

No comments:

Post a Comment