Quality Dasher GA septic system installers do a number of examination, long before a unit gets placed into the ground. A new unit will last many years, and possibly even generations, if it’s installed properly, but it can fall short instantly if it’s not. Additionally, all Dasher GA septic system installers must secure a permit for them to carry out the install, and may ought to work with city or county officials to show that particular tests were run in order to progress. These three tests are essential primary steps that should always be taken before any work or designs are done, and it may also be advantageous to accomplish them before you acquire a property, so you can be assured that a tank and leach field will be permitted.

1. Pit

The pit test is relatively direct. During this test, a hole is dug down and the soil is analyzed to establish its structure. A typical leach field is dependent on the soil’s structure to drain efficiently. If there is a considerable amount of gravel or sand, your leach field should be able to discharge the effluent (water) from the tank well, where the soil will finish sanitizing it. If the soil has a considerable amount of clay or rock, it won’t sink well, therefore a conventional leach field will not be an alternative. If the site you’ve selected does not pass the pit test, you may be able to select another site on your home or use an alternate kind of drain field, such as a mound system.

2. Perc

The perc, or percolation test, calls for excavating a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then filling it with water. The hole is generally left saturated for about two hours, and topped off as needed. Then, the hole is filled with 6 inches of water and monitored for water drainage.

3. Visual

There are numerous things an inspector will check visually. Many units are gravity-fed, so they don’t rely on electricity or pumps to transfer effluent from the tank to the leach field. Because of this, the slope of the ground is essential. An inspector will also look for slopes that could feed excessive water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.

Enlist the Services of Quality Dasher GA Septic System Installers Now

Picking the right configuration, style of system, and assessing the land properly, are all essential procedures in making sure an install goes off without a hitch. Most significantly, these steps ensure that the install is done correctly, so that a system provides many years of use without issue. If you’re prepping for an install, contact Septic Tank Pros Valdosta GA. Our partner technicians are knowledgeable and committed to quality, so you can be sure the job is done right. Call (229) 415-7780 now.